00 · Site review

Send us the site. We will assess where the grid connection can create value.

CHECK

We review the connection, load profile, planned loads and operating goals. A battery may be the first project, but the assessment starts with the whole site.

A first review before a proposalSite review · 00 of 03
01 · ProcessHow it worksThree steps
Review · qualify · propose

From site data to a clear answer.

We review the site

We study the load profile, grid connection, planned loads and the outcomes that matter to your operation.

We identify the first value case

We test where control, storage or another flexible asset can create enough value within the site's limits.

We propose the model

If the project fits, we set out the system, ownership model, operating scope and result we can stand behind.

No proposal before the site makes senseSite review · 01 of 03
02 · FitSites we reviewIndustrial and commercial loads
Five property types

Sites we review.

We review commercial and industrial sites where peak demand, planned electrification or local operating needs make the grid connection a real constraint.

Logistics and warehouses.

Charging, conveyors and climate control can create sharp peaks and new capacity needs.

Offices and business parks.

Ventilation, cooling and charging can create repeatable peaks that are worth reviewing.

Shopping centers and retail.

Refrigeration, lighting, charging and seasonal loads can compete for the same connection.

Manufacturing and industry.

Machinery, shifts and planned production upgrades can make power capacity a site constraint.

Data centers, cold storage, and mixed-use.

Cold storage, data rooms and mixed-use sites need a review of load, resilience needs and operating limits.

The load profile and grid connection decide the fitSite review · 02 of 03
03 · Site detailsTell us about the siteLoad data helps
First review

Assess your grid connection

Give us the basic site data. We will review the first value case before we suggest equipment or a commercial model.

Drop an energy bill or hourly consumption export (PDF/CSV)

We can extract basic site details from a bill. Hourly load data gives us a stronger basis for the review.

Hourly load data and details of planned loads help us assess the site.
End of site formSite review · 03 of 03